The Business, Creative, and Management skills 3D Motion Designers need to work with clients. The entire process. Brief to delivery. Kit and caboodle 👇


54

Lessons

19

Case Study Videos

200

Page eBook

$203,864

In Source Files

Unlimited

Support

Lifetime

Access

JOIN THE LEGENDS 🚀

GO FROM GOOD TO GREAT 💎

Learning cool animation techniques is all well and good. But if you want to separate yourself from the pack you need a different set of skills.

  • 👉 Skills you can't learn from a thousand daily renders or personal projects.

  • 👉 Skills that $50,000+ university courses hardly even touch.

  • 👉 Skills you only get from experience as a Designer, Producer, Creative & Art Director.

This Motion Graphic Design course is not about pushing pixels or buttons harder. It’s about pushing the quality of your creative, collaborative, and business skills.

That’s what separates good artists from great designers, and what keeps their clients coming back for more.

10+ YEARS OF EXPERIENCE IN 10 DAYS

In this extreme sport version of an online Motion Design course I’ll explain every step of an optimised Motion Graphic Design Process. You will learn how to:

  • ✅ Direct Motion Design projects of any scale

  • ✅ Know what clients and agencies expect at each stage of a project

  • ✅ Create, break down and respond to briefs

  • ✅ Master the finances of freelance: estimates, quotes, proposals, and invoices

  • ✅ Anticipate and overcome cost objections

  • ✅ Create treatments, concept decks, and presentations that clients love

  • ✅ Perfectly plan, structure, and manage projects

  • ✅ Plough through pre-production: Styleframes, Scripts, Storyboards, Animatic

  • ✅ And breeze through production: Previs, Roughcut & Proofing

  • ✅ Juggle, respond to and counter feedback

In a matter of weeks you’ll gain 10 years worth of knowledge from within the Motion Design and Animation industry. Pitfalls and cheeky little secrets included.

Get the skills to work flawlessly with clients.

Daniel Danielsson delivering a talk at London Motion Design Meetups
Daniel Danielsson Director and Artist

MEET THE TEACH 🤓

Greetings! I’m Daniel Danielsson.

I started my very first Design & Animation company in 2010. The reel featured me getting hit by a car (VideoCopilot tutorial style), the world exploding (twice) and my friend’s skull imploding. I sincerely hope no one ever finds it.

Since then I’ve moved up a bit. I’ve worked on beautiful brands with industry heavyweights like The Mill, Saatchi & Saatchi, and Leo Burnett.

In 2016 I started spreading the love for Motion Design through my YouTube channel, where I've successfully spread it to over 1 million people. Watch out, you could be next.

If you know my channel, you know my vibe. The Process of Motion has the same flow, lame jokes and bad language. But the knowledge is from a whole other dimension.

See you there.​

Daniel Danielsson has done Motion Design and Advertising work for The Mill, Leo Burnett, Saatchi & Saatchi, AKQA, 72 and Sunny, BBC, Disney Channel,
Daniel Danielsson has done Motion Design and Advertising work for Sky, Nike, Johnnie Walker, Lush, Axe and Lynx, Heinz, Vodafone

ABOUT THE COURSE 🗺️

PART 1:
CORE THEORY

A hefty dose of knowledge about Client Service, Project Management, Creative and Art Direction and Motion Design Production.

Part one of the course includes:

     👨‍🏫 54 succinct Lessons in 5 Chapters

     📖 200-page e-Book for easy reference

     🚩 Common issues and how to solve them

     🔗 References, assets, and further reading

The chapters represent the phases of a comprehensive Motion Graphic Design project. All visualised & explained through the magic of ✨ Animation ✨.

Lemme break it down for you.

The Full Process of Motion Design Simplified
Process of Motion Design Course Case Study Client NORR Watches Logo

PART 2:
CASE STUDY

NORR are about to release their flagship smartwatch carved from genuine Icelandic volcanic rock. Now they just need some Motion Design magic to launch it...

It's an impossibly big brief, tight budget, and ridonculous requirements. And you’ve got front row tickets to the whole spectacle. From brief to delivery.

TRIAL BY FIRE 🔥


The theory is about to get real. The NORR case study shows you exactly how to apply the theory in the chaotic tempest of a client project.

See how the process stands up to assets that are never supplied, ever changing directions, shortened deadlines, and day-of-deadline changes.

Part two of the course contains:

     📼 19 (Painfully honest) Breakdown Videos

     🧬 13 Concept & Process documents

     🔎 40+ Client Proofs

     🎁 17 Documents & Templates for use in your own projects

The case study gives you 100% insight into the NORR project. Yes, that includes fkups and embarrassment.

PART 3:
SOURCE FILES

If you really really want to get deep into the software side of the project, you can. The ultimate version of the course includes:

   🎥 17 Cinema 4D original scene files

   📸 100+ production quality Textures

   🌋 67GB+ Turbulence FD and X-Particles simulations

   🏔 5 World Machine procedural landscape scenes

   🎞 90GB+ CG Renders as layered EXR sequences

   🎬 Full After Effects compositing files

You get everything you need to rip the project apart & put it back together. If the client wanted these files I'd charge them about US$203,864. (That's explained on the course.)

Process of Motion Design Course comes with source files

Oh, and you also get over 21 hours of time-lapses from the NORR project.

(From about 500 hours of recorded footage)

JOIN THE LEGENDS 🚀

JOIN NOW, DECIDE LATER 🍰

Decisions can be difficult. That’s why the course has a 2 week love-it-or-leave-it guarantee.

Just choose your version of the course below and boom! Instant lifetime access.

If you change your mind or don't like it, just let me know within 14 days and un-boom! Full refund. Like it never happened.

No questions asked. 🤫

Process of Motion Design Course comes with a guarantee so you can have your cake and eat it too
KiNO VibesProcess of Motion

Black Friday Master Bundle

Process of Motion Included with bundle

Master light in 3D like an award-winning cinematographer with KiNO Vibes.

Win work, direct the project, manage the job & client, and get paid with the Process of Motion.

Stock bundleWas £549, now £299
Master bundleWas £774, now £449
See the bundles

Ends Monday 30 Nov, 23:59 GMT

Rated Excellent on Trustpilot Read all the reviews ↗ “I’m not sure how many times I asked myself: damn, why wasn’t I thinking like that before?” Simon (KiNO Vibes) “I can already see my work take a massive step for the better! Absolutely worth it.” Ignacio (KiNO Vibes) “Recommended if you want to improve your lighting, composition and atmosphere in 3D.” Mike McDowall (KiNO Vibes) Rated Excellent on Trustpilot Read all the reviews ↗ “Golden content, excellent teacher!” Thibault Millienne (KiNO Vibes) “This class falls into the freaky genius category for me.” David Ariew (The Process of Motion) “This is one of the best courses I’ve ever purchased on any subject.” Yes Captain (The Process of Motion) Rated Excellent on Trustpilot Read all the reviews ↗ “This course filled in all the gaps my education was lacking.” Angelica (The Process of Motion) “Battle tested industry production knowledge with a fanatically engaging and original presentation.” Doug Brown (The Process of Motion) “Daniel shows you more from the point of view of a mentor rather than a lecturer/teacher.” Adam (The Process of Motion) Rated Excellent on Trustpilot Read all the reviews ↗ “The real deal - he knows what he’s talking about.” Andy R (The Process of Motion) “I am 1000% better because of it.” Robert Aitken (The Process of Motion) “Daniel meticulously breaks every step of the pipeline and does so in a very engaging way.” Onur (The Process of Motion) “It is probably the most valuable course I have ever encountered.” Behrad (The Process of Motion) Rated Excellent on Trustpilot Read all the reviews ↗ “I’m not sure how many times I asked myself: damn, why wasn’t I thinking like that before?” Simon (KiNO Vibes) “I can already see my work take a massive step for the better! Absolutely worth it.” Ignacio (KiNO Vibes) “Recommended if you want to improve your lighting, composition and atmosphere in 3D.” Mike McDowall (KiNO Vibes) Rated Excellent on Trustpilot Read all the reviews ↗ “Golden content, excellent teacher!” Thibault Millienne (KiNO Vibes) “This class falls into the freaky genius category for me.” David Ariew (The Process of Motion) “This is one of the best courses I’ve ever purchased on any subject.” Yes Captain (The Process of Motion) Rated Excellent on Trustpilot Read all the reviews ↗ “This course filled in all the gaps my education was lacking.” Angelica (The Process of Motion) “Battle tested industry production knowledge with a fanatically engaging and original presentation.” Doug Brown (The Process of Motion) “Daniel shows you more from the point of view of a mentor rather than a lecturer/teacher.” Adam (The Process of Motion) Rated Excellent on Trustpilot Read all the reviews ↗ “The real deal - he knows what he’s talking about.” Andy R (The Process of Motion) “I am 1000% better because of it.” Robert Aitken (The Process of Motion) “Daniel meticulously breaks every step of the pipeline and does so in a very engaging way.” Onur (The Process of Motion) “It is probably the most valuable course I have ever encountered.” Behrad (The Process of Motion)
Process of Motion: MASTER
£399.00
One time
£79.00
For 6 months

For the ultimate connoisseur. This one comes with everything. If you’re into both Cinema 4D and spending money, this is the clear choice for you. Lifetime access included. 👌


✓ 🗺️ CORE THEORY: 50 Video Lessons and E-Book
✓ 🌋 NORR CASE STUDY: 19 Breakdown Videos, WIPs & Client Calls
✓ 💎 SOURCE FILES: 150GB+ of Files and 1,200min+ Time-lapses
✓ 📜 BONUS: 12 Guides, Templates & Presets
✓ 🤗 Unlimited Questions & Answers
Process of Motion: STOCK
£299.00
One time
£59.00
For 6 months

All of the knowledge, examples, breakdowns and templates. If you’re here for professional Motion Design and Animation, this is the one for you. Lifetime access included. 👌


✓ 🗺️ CORE THEORY: 50 Video Lessons and E-Book
✓ 🌋 CASE STUDY: 19 Breakdown Videos, WIPs & Client Calls
✓ 📜 BONUS: 12 Guides, Templates & Presets
✓ 🤗 Unlimited Questions & Answers

FREQUENTLY ASKED QUESTIONS 🙋

Have a question that’s not on here? Send me an email at d@danieldanielsson.com and I'll get back to you asap.

Previous
Previous

KiNO Vibes: Cinematography for 3D Artists

Next
Next

Process of Motion: LITE